See which units are under warranty, which jobs are near their statutory deadline, and what you owe each dealer. In the field, the IWB Technician app keeps logging work when the connection drops and sends it when the signal returns.
When you open a service order, the equipment record shows which warranty covers the unit. IWB suggests the coverage and explains why, and you make the call. Five warranty types, including manufacturer, dealer labor, and extended warranties, sit side by side on the same unit. QR-coded equipment records can't be deleted, so replaced or scrapped units stay in the history.
A warranty starts from an event such as delivery, commissioning, acceptance, or sale
If a consumer unit's warranty policy falls below the legal minimum, IWB warns you and leaves the policy as it is
Each serial number you ship gets its own equipment record
/servis/cihazlarexample data
Diesel generator 60 kVA · WarrantiesCHZ-000418
Active
Contact
Boğaziçi Mimarlık ve Tasarım Ltd.
Serial no.
DJ60-2503-4471
Regime
Commercial
Warranty start
Commissioning · 3/24/2025
Manufacturer
3/24/2025 - 3/24/2027
Dealer labor
3/24/2025 - 3/24/2026 · ended
Extended
3/25/2027 - 3/25/2029
02
Know where a job stands when the customer calls
Orders move through your own stage names and the transitions you define, and closed orders are locked. When a unit comes into the workshop, its accessories, damage, and photos are recorded at intake. The device PIN is stored encrypted and every view is logged with a reason. The PIN is deleted when the unit goes back to the customer.
If an order needs a quote, work doesn't start until the quote is approved
The intake wizard starts with the customer, unit, and complaint and ends with choosing consumer or commercial rules
For consumer work, the list counts down the legal deadline in business days
/servis/emirlerexample data
Service orders
Open jobs47
Scheduled today
Awaiting parts
Statutory period exceeded0
Statutory period at risk3
Unassigned6
Order no.
Contact · equipment
Stage
Statutory period
SRV-2026-01594
Ege Yapı Malzemeleri A.Ş. · Split air conditioner
Received
No statutory period
SRV-2026-01577
Boğaziçi Mimarlık ve Tasarım Ltd. · Diesel generator
On site / In workshop
No statutory period
SRV-2026-01568
Anadolu Cephe Sistemleri Ltd. · Booster pump
Awaiting price approval
No statutory period
SRV-2026-01556
Individual customer · Combi boiler 24 kW
Awaiting parts
9 business days left
SRV-2026-01485
Individual customer · Dishwasher
Scheduled
2 business days left
For consumer work, the statutory period counts down in business days; commercial work shows "No statutory period".
03
Fill technicians' days without overbooking them
See each technician's daily utilization and drag a job onto the right day. If two dispatchers make conflicting changes at the same time, IWB catches it. Route suggestions order visits by straight-line distance and a road factor, and nothing changes in the plan until you apply them.
Capacity comes from Human Resources, and days off and public holidays show as "Not available"
Overlap, daily cap, and skill warnings show up without blocking the plan
Route suggestions don't use external map or traffic data
/servis/dispecerexample data
Dispatch board
Mon, Oct 19Tue, Oct 20Wed, Oct 21Thu, Oct 22Fri, Oct 23Beşiktaş teamField technician47%69%89%38%Ümraniye teamField technician75%66%Not available71%25%Kadıköy teamField technician50%44%63%128%41%Ataşehir teamField technician72%77%50%19%Not availableMaltepe teamField technician38%54%69%46%75%
Unassigned jobs: 6. Drag a job onto a technician's day: the visit is scheduled on that day, after the last job.
04
Don't lose field work when the connection drops
Technicians download their work package to the phone, and what they do on site waits there until the connection returns. Each entry then goes to the office and is applied only once; entries the office rejects show up with the reason. IWB Technician is a web app installed from the browser, and you can revoke a lost phone remotely.
Interrupted photo uploads resume where they stopped
Find a unit's history by QR code or barcode
Customers sign on the phone
Rejected entries wait for the office
The office sees rejected entries in the "Sync center" and can retry them, approve them with the system time, or cancel them.
TechnicianSRV-2026-01577 · On site
Offline · Pending: 3
Offline · Pending: 4
Sending…
Synced
Generator failure
Beşiktaş · Boğaziçi Mimarlık
Checklist
Fuel and oil level
Battery and charging test
Load test
Photos
PauseCompleted
05
Keep returned units from gathering dust
You can see which warehouse holds each returned unit and what was decided about it. Under a return merchandise authorization (RMA), customer property goes to a custody warehouse and company property to quarantine. After inspection, you choose one of 8 dispositions, such as repair, replacement, credit, or scrap. With advance replacement, the replacement ships before the defective unit arrives, and supplier RMAs open from a customer RMA or a removed part.
Inspection results: fault confirmed, no fault found, customer-caused damage, or out of warranty
The replacement is invoiced, and the invoice stands if the defective unit isn't back by the due date
A supplier return can be linked to a purchase return in Purchasing
/servis/rmaexample data
RMA
RMA no.
Contact · product
Status
Advance replacement
RMA-2026-00214
Ege Yapı Malzemeleri A.Ş. · Split AC indoor unit
Inspecting
-
RMA-2026-00211
Anadolu Cephe Sistemleri Ltd. · Booster pump
Resolving
Return due 10/30/2026
RMA-2026-00209
Individual customer · Robot vacuum
ReceivingInspecting
-
RMA-2026-00206
Deniz Yapı Kooperatifi · UPS battery module
Approved
-
RMA-2026-00198
Aydınlar Yapı Denetim A.Ş. · Boiler control board
Resolving
-
The disposition follows inspection: repair order, replacement, credit, refund, return to customer, scrap, refurbishment, or send to supplier.
06
Every dealer payout comes itemized
At the end of each month or quarter, IWB prepares a progress billing (hakediş) for each service point, showing what you owe it. The dealer receives a confirmation statement. Your dealers, authorized service providers, and installers each have a record in IWB, and you send them orders as jobs. Warranty claims are priced with the tariff version in force on the repair date.
Claim checks make suggestions and don't reject a claim on their own
The person who opened a claim can't decide on it
The dealer's e-Invoice is matched to its progress billing in Purchasing
/servis/hakedislerexample data
Progress billings
Period: 9/1/2026 - 9/30/2026
Progress billing no.
Service point
Status
Net (excl. VAT)
SHK-2026-00031
Karadeniz Klima Yetkili Servis
Sent for confirmationConfirmed
48.3K ₺
SHK-2026-00030
Körfez Teknik Servis
Disputed
31.6K ₺
SHK-2026-00029
Başkent Montaj
Confirmed
22.9K ₺
SHK-2026-00028
Çukurova Bayi Servis
Invoiced
17.4K ₺
SHK-2026-00027
Trakya Yetkili Servis
Paid
26.8K ₺
The confirmation statement is locked and sent to the dealer, who confirms or disputes it in the portal.
When your support team hands a ticket over to service, the order opens with the customer, product, serial number, and complaint. Parts the technician uses come out of stock. The billable part becomes a draft invoice in Sales, and the share covered by warranty or contract is deducted as a discount.
Ask about an order's stage and a unit's history and warranty, or check where an RMA stands. For closing notes, triage, and visit briefings, IWB AI asks for your approval first and leaves only a draft for you to apply.
IWB AI is off by default in Field Service; you turn it on in settings and choose who can use it. It doesn't fill in orders itself.
Answers your questions
What stage are Boğaziçi Mimarlık's open service orders in?Searching service orders
Is generator DJ60-2503-4471 under warranty?Checking warranty status
What faults has DJ60-2503-4471 come in for before?Fetching equipment history
Acts with your approval
Leave a service closing note draft
Leave a service triage suggestion
Leave a service visit briefing
Every action comes to you first as an approval card. IWB AI doesn't create or change records without your approval.
09Capabilities
What you can do with Field Service
Periodic maintenance plans
Set maintenance intervals in days, weeks, months, or years. When maintenance falls due, the order opens automatically.
Installation report
When the customer signs the report, the commissioning date is recorded. The signature starts the warranty tied to commissioning and the pending maintenance schedule.
Parts usage
Parts come out of the warehouse on the line, the technician's van, or the company warehouse.
Service documents
IWB prepares 8 document types, from the intake receipt to the loaner slip. Documents are versioned, and each signature stays tied to the version that was signed.
QR-coded labels
Anyone who scans the label sees the warranty status and the last maintenance. If you choose, the same label also takes fault reports.
Status and quote links
Customers follow the job status without signing in and approve quotes through a one-time link.
Recall campaigns
Find affected units by product, serial range, lot, and region, then open orders in bulk.
Meters and telemetry
Meter readings and events arrive from the unit through a gateway. An alarm rule you define can open a draft service order.
10Compliance
Count consumer repair deadlines in business days
On each unit and order, you set whether the work falls under Turkish consumer law or counts as commercial. Statutory periods and thresholds are stored as parameters and tracked. They arrive marked "Unverified" and you can change them; IWB doesn't treat them as verified, and confirming them is up to your organization.
6502For consumer work (Consumer Protection Law No. 6502), the maximum repair time is counted in business days, excluding weekends and public holidays.
GBYUnder Turkey's warranty certificate regulation, "Not repairable" and misuse decisions require a technical report with a rationale.
TBK m.92The warranty period includes its last day (Turkish Code of Obligations).
VUK 231/5For completed billable work, IWB warns you as the 7-day invoicing deadline in the Tax Procedure Law approaches.
İYSBefore a marketing SMS goes out, consent is checked in İYS, Turkey's consent registry for commercial messages. Informational messages don't need İYS.
KVKKWhen a contact is anonymized under KVKK, Turkey's personal data protection law, personal fields on service orders, RMAs, and requests are masked too.
Do technicians download the app from an app store?
No. IWB Technician is a web app installed on the phone from the browser. It keeps logging work when the connection drops and sends it once the connection is back. On iPhone, Safari can't read barcodes with the camera, so you can use a handheld scanner instead.
Can customers get SMS or WhatsApp notifications?
Status links, quotes, and notifications for stages marked "Notify customer" can go out by SMS or WhatsApp. WhatsApp needs your own Meta account, an approved template, and the number owner's explicit consent. If there's no provider or no consent, IWB shows a clear warning instead of silently skipping the message. SMS and WhatsApp are off by default for stage notifications.
Does IWB track legal deadlines for consumer equipment?
Yes. The maximum repair period is counted in business days and shows as a badge in the list. As the threshold approaches, the manager gets a warning. The periods are parameters you can change, and confirming them is up to your organization.
Can I manage a network of dealers and authorized service providers?
Yes. You send jobs to the service points in your network. Warranty claims are priced with the tariff version in force on the repair date. At period end, IWB prepares the progress billing and confirmation statement. Dealers can't see your finance or inventory data.
How are service invoices issued?
The billable part of an order becomes a draft invoice in Sales, and the share covered by warranty or contract is deducted as a discount. An order can't close until it's invoiced, but you can close it without an invoice if you enter a reason.