Your plan shows material shortages and overloaded work centers up front: requirements planning (MRP) suggests what to buy and what to make, and IWB schedules orders against each work center's capacity. IWB locks the expected cost when an order goes into production, and every completion waits in your accountant's approval list to be posted as a journal entry.
Mark a BOM as confidential, and only the users you've given permission can see what's in it. Everyone else sees the contents masked on the BOM card, in the BOM tree, in exports, and on production order lines. Each BOM line takes a fixed, per-batch, percentage, or formula quantity (for example, width × length / 1,000,000 = m² of glass).
The formula is calculated once when the production order opens, then stays fixed
Order lines are copied from the BOM, so later BOM changes don't alter open orders
/uretim/recetelerexample data
BOM · Components
RCT-000003 · Aluminum profile 6063, painted · 6 mDefaultConfidential formula
#
Component
Quantity
Scrap %
1
Aluminum billet · STOK-000088
6.2 kg
1.5%
2
Powder coating mix · STOK-000141
0.35 kg (Per batch)
0%
3
Stretch wrap · STOK-000290
(width + length) * 2 / 1000 (Formula)
0%
Users without permission see "This BOM's contents are hidden from you" instead of this table. Viewing the contents takes a separate permission.
02
Keep rework and disassembly costs on the books
Disassembly, conversion, repackaging, and rework orders go through the same completion and accounting steps as a manufacturing order. If the BOM has operations, opening the order creates one work order per operation. The material status view shows stock in the production warehouse and the source warehouse side by side.
Complete an order in parts, and close the remainder when the job is done
Open a material transfer from the material status view
/uretimexample data
Production orders
All production orders126
Draft6
In production13
Completed103
Canceled4
Unscheduled4
Disassembly orders
Conversions
Code
Status
Type
Product
Planned
Produced
Planned date
URT-2026-00126
In production
Manufacturing
Composite panel 4 mm
340 pcs
120 pcs
10/28/2026
URT-2026-00125
Draft
Manufacturing
Facade anchor set
1,500 pcs
-
10/30/2026
URT-2026-00124
Partially completed
Manufacturing
Aluminum profile 6063
1,200 kg
620 kg840 kg
10/14/2026
URT-2026-00123
Completed
Manufacturing
Connection kit
2,000 pcs
2,000 pcs
10/12/2026
URT-2026-00122
In production
Manufacturing
Hinge assembly
4,500 pcs
3,100 pcs
10/16/2026
URT-2026-00121
In production
Manufacturing
Connection kit
1,000 pcs
420 pcs
10/23/2026
URT-2026-00120
Completed
Disassembly
Connection kit
40 pcs
40 pcs
10/9/2026
In a disassembly, the product goes out and its components come in, with the cost spread across the components.
03
Skip the end-of-shift paperwork
Operators log output, waste, scrap, and downtime at the workstation as the work happens. They select their workstation, open a shift, scan a barcode or QR code to find the job, then start and finish it. Waste, scrap, and downtime each need a reason from a predefined list, and output gets a new lot with scanned serial numbers.
Full-screen view with no menus, built for tablets and handheld terminals
Barcode and QR scanners work like a keyboard
A wrong entry stays on record and is canceled with a reversal
Using the shop floor screen takes a separate permission, off by default
Weeks that exceed capacity are marked in red, and the daily breakdown flags each overloaded day. IWB schedules orders forward, day by day, for each work center, and reports any order it can't fit along with the reason. At a required quality check, only output entry is locked until a result is entered.
"Passed" or "Conditionally accepted" allows output entry, and for a lot check the quarantined lot is released
"Failed" keeps output entry locked, and IWB suggests scrap or rework
/uretim/kapasiteexample data
Capacity
Week of 10/19Week of 10/26Week of 11/02Week of 11/09CNC Machining Center16 h per day112%86%64%30%Profile Cutting Line16 h per day94%71%55%20%Powder Coating Line8 h per day78%90%48%Composite Panel Workshop8 h per day61%58%35%Assembly and Packaging8 h per day42%66%40%12%
Horizon 4 weeks · 5 working days a week · utilization: load / capacity
05
Find what pushed an order over its planned cost
Compare planned and actual cost for an order in one report. When the order opens, IWB records the expected cost of materials, labor, and manufacturing overhead, then locks it once the order goes into production. The report splits the difference into material usage, material price, labor, and overhead.
Variance is an analysis report and doesn't post to the ledger
Labor and overhead are applied as time × hourly rate
Cost analysis takes a separate permission, off by default
Posting stays in your accountant's hands
In manufacturing orders, every completion reaches your accountant's approval list as a separate document. Once posted, the journal entry debits 152 Finished goods. It credits 150 Raw materials and supplies and the 721 and 731 cost transfer accounts of the Turkish Uniform Chart of Accounts.
The suggestion list shows the latest date to start buying or making, and flags suggestions that are past it. MRP pulls demand from sales orders, production order components, and project budgets, and adds CRM opportunity forecasts if you turn that setting on. It treats safety stock as the floor when it calculates net requirements and shows the demand behind every suggestion. The suggestions you pick become purchase requisitions, draft production orders, or transfer orders.
Each run is a snapshot: the quantity you approve matches what you saw on screen
When planning by warehouse, IWB first tries to cover the need from free stock in another warehouse
/planlama/malzeme-ihtiyacexample data
Material requirements
All suggestions42
To purchase24
To produce11
To transfer4
Not plannable3
Converted9
Overdue5
MRP-2026-00021 · 10/19/2026 · 42 suggestionsNet by warehouse
Code
Item
Suggestion
Warehouse
Quantity
Order date
Need-by date
STOK-000101
Aluminum profile 6063
To purchase
Main warehouse
2,400 kg
10/21/2026
11/4/2026 (14 days)
STOK-000356
Connection kit
To produce
Main warehouse
600 pcs
10/23/2026
10/28/2026 (5 days)
STOK-000377
Facade anchor set
To transfer
İzmir job site warehouse
120 pcs
10/22/2026
10/24/2026 (2 days)
STOK-000611
Screw M6
To purchase
Main warehouse
8,000 pcs
10/17/2026 · Overdue
10/31/2026 (14 days)
STOK-000530
Custom gasket set
Not plannable
Main warehouse
300 pcs
-
10/30/2026
Items that can't be planned aren't skipped silently: an item with no BOM that also can't be purchased still gets a suggestion line.
MRP reads the sales order as demand and suggests a draft production order, or you can open the order directly from the sales order line. If the bill of materials (BOM) has operations, the order is split into one work order per operation. When you complete it, IWB records the consumption and finished-goods stock entries, and the completion goes to your accountant's approval list.
Ask which orders are in production, which BOMs use a component, or which work center is over capacity. IWB AI asks for your approval before it opens, starts, completes, or cancels an order.
IWB AI doesn't set up BOMs, routings, or work centers, and it doesn't run requirements planning (MRP).
Answers your questions
Which orders are in production right now?Searching production orders
Which BOMs use the powder coating mix?Finding where it's used
Which work centers are over capacity in the coming weeks?Calculating capacity load
Acts with your approval
Open production order
Start production
Complete production
Cancel production order
Every action comes to you first as an approval card. IWB AI doesn't create or change records without your approval.
09Capabilities
What you can do with Manufacturing
Alternate BOMs
IWB picks the BOM by branch, quantity range, and effective date.
Order-specific BOMs
Created from a sales order line, used only for that order, and kept out of the catalog.
Shared routings
Define routings separately from BOMs and share them across products. Steps can include a quality check.
Where used
See which BOMs a component appears in, and download the tree as a CSV file.
Potency adjustment
IWB suggests how much to weigh out based on the lot's measured potency, and you make the call.
Waste and downtime reasons
Set up waste, scrap, downtime, and breakdown reasons as a tree. Operators pick from it on the shop floor screen, and waste, scrap, and downtime entries require a reason.
Master production schedule
Turn it on in settings. Committed quantities either consume actual demand or add to it.
Data quality panel
See the parameters that throw off planning, grouped together, and fix them with bulk edits.
No. MRP calculates material requirements. You track capacity load and finite scheduling in Manufacturing, on the "Capacity", "Station schedule", and "Planning board" screens.
Does the shop floor screen work offline?
No. The shop floor screen runs in the browser and needs a connection. If an entry is retried after the connection drops, it isn't recorded twice. Using the screen takes a separate permission, which is off by default.
Can I track subcontracted production?
Yes. You mark a work center as subcontracted and link the subcontractor's vendor account and warehouse to it. A draft subcontracting purchase order opens from the work order, and the goods receipt records the return from the subcontractor.
Can everyone see my BOMs?
Not if you mark them confidential. Users without permission can't see a confidential BOM's contents on the BOM card, in the tree, in exports, or on production order lines. Viewing them takes a separate permission, which is off by default.
How do I give a customer a promise date?
When you check availability on a sales order line, IWB looks at free stock first, then available to promise (ATP), then capable to promise (CTP). CTP takes the BOM's components into account and adds production lead time. Giving a promise date doesn't reserve stock.