MaintenanceMWOFREQP

Keep your machines from stopping unplanned

Know which machine is down, when each statutory inspection is due, and what you've spent on a piece of equipment this year. Fault reports reach the maintenance team, and work orders open on their own when a plan comes due.

Runs in your browser. In the cloud or on your own server, it's the same IWB.

Records
MWOFREQP
Statutory inspection template
66 rows
Work order types
6
Plan triggers
Calendar and meter
Connected modules
6

01

Get fault news to the maintenance team without delay

The employee running the machine reports the fault by scanning its QR label, from the Report a fault screen, or from the maintenance terminal, and a machine fault entered in Manufacturing opens a report as well. If "Equipment stopped" is checked, priority is at least High and the equipment shows as Defective. The maintenance manager reviews the report and converts it into a work order, rejects it, or marks it as a duplicate.

  • Whoever scans the QR label signs in, and the form recognizes the equipment
  • The form warns if the same equipment has an open record from the last 24 hours
  • The reporter is notified of the decision and when the fault is fixed
  • Up to 10 photos can be attached to a report

Priority comes from the equipment

The suggested priority comes from the equipment criticality: a fault on an A (High) machine is suggested as High priority.

02

Don't let overdue maintenance slip by

You follow work orders in a list, on a board by status, or on a calendar. Drag a card to approve, start, hold, or complete the job; putting a job on hold requires a reason. A job past its due date gets an Overdue badge, and its owner is notified every day.

  • The due date is suggested from priority: Urgent 2 hours, High 8 hours (adjustable)
  • Improvement jobs, or every manually opened job, can require approval
  • A job goes to one assignee and up to 20 helpers
  • Open jobs also appear in the person's My work list

03

Keep a "Nonconforming" machine out of service

You run each periodic inspection as a work order: when you complete it, you enter the result, the report number, and the inspecting body, and attach the report. If the result is Nonconforming, the equipment is taken out of use, and an urgent corrective work order plus a re-inspection seven days after the corrective due date open on their own. A conditionally conforming result opens a follow-up inspection for the condition deadline.

  • A periodic inspection cannot be completed without a report attachment
  • Equipment out of use returns to service only with a Conforming result, or by a separately authorized user who records a reason
  • The maintenance manager and the equipment owner are notified

The report is locked

Report attachments are locked when the inspection is completed; the lock is lifted if the job is reopened.

04

Don't leave planned maintenance to memory

A maintenance plan sets frequency by calendar, by meter, or by whichever comes first. When a period comes due, the work order opens on its own in Scheduled status, as many days ahead as the plan's lead time, and the owner is notified. On the calendar you see open jobs alongside forecast periods for which no work order has opened yet.

  • Meters count hours, kilometers, cycles, or units
  • A new period does not open while the previous job is still open (configurable)
  • Preventive maintenance is skipped for equipment on standby or out of use, while statutory inspections continue
  • All machines in an equipment class can be added to a plan together

05

Know what you've spent on each machine

Technicians record the parts, external services, and time they used on the work order, and can pick parts from the equipment parts list. When the job is completed, item-linked parts are issued from inventory in a single issue document. Labor cost comes from time and the hourly rate, and when you close the work order you choose whether its cost is an expense or a capitalization candidate.

  • If no warehouse is chosen, the maintenance warehouse from settings is used
  • Unused parts go back to the warehouse with Return parts
  • A job waiting for materials can open a draft purchase requisition in Purchasing
  • Costs are visible only to people you authorize

The last 12 months on the equipment record

The equipment record shows the number of faults, downtime, and maintenance cost for the last 12 months.

06

See which machine stops you most

The Faults and Downtime by Equipment report counts breakdown work orders opened in the period for each piece of equipment and shows total and average downtime. Equipment falls into classes A, B, and C by its share of downtime, so you look first at the machines behind the first 80%. The Plan Compliance report shows how much planned work was done on time, and Maintenance Cost by Equipment shows parts, labor, and external service amounts.

  • You choose the date range, and the report can be exported
  • Jobs without equipment (buildings, locations) appear on a separate row
  • Canceled work orders are not counted

07Document flow

Keep the record unbroken from fault to cost

A machine fault entered in Manufacturing opens a fault report in Maintenance, and the equipment shows as Defective. You convert the report into a work order. When the technician completes the job, the parts used are issued from inventory and the accounting entry is posted as a maintenance parts issue. When you close the work order, you choose whether its cost is an expense or a capitalization candidate.

  1. Machine fault
  2. Fault reportFR-2026-00161
  3. Work orderMWO-2026-00418
  4. Parts issue
  5. Accounting entry
  6. Close and cost

08IWB AI

Ask IWB AI where maintenance work stands

Ask about work orders in progress, active plans, or the machine that stopped most this month. IWB AI asks for your approval before it starts a job, adds parts, or opens a purchase requisition.

See how IWB AI works

IWB AI doesn't complete or close work orders or enter periodic inspection results, and it doesn't predict failures.

Answers your questions

  1. How many maintenance work orders are in progress?

    IWB AI
    Listing records

    3 maintenance work orders are in progress:

    MWO-2026-00417Compressor 2,000-hour serviceIn progressMWO-2026-00398Profile cutter monthly serviceIn progressMWO-2026-00393Boiler annual serviceIn progress
  2. How many maintenance plans are active?

    IWB AI
    Listing records

    18 maintenance plans are active. The first three:

    MPL-000006Powder coating booth filter changeActiveMPL-000004Compressor 2,000-hour serviceActiveMPL-000002Lifting equipment periodic inspectionActive
  3. Summarize faults and downtime by equipment this month

    IWB AI
    Preparing report

    October had 14 faults and 2,084 min of downtime. The powder coating oven stopped most: 33.1% of downtime.

  4. Open a purchase request for MWO-2026-00414

    IWB AI
    Open purchase requestWaiting for approvalRunning
    Work order
    MWO-2026-00414 · Overhead crane rope replacement
    Lines
    Row 1 · ITEM-000738 · Steel wire rope 12 mm · 32 m

    Open purchase request· completed

Acts with your approval

  • Open purchase request
  • Start
  • Choose checklist
  • Add from list
  • Edit part

For documents with lines, the form opens filled in and you save the record. Every other action comes to you first as an approval card; IWB AI doesn't create or change records without your approval.

09Capabilities

What you can do with Maintenance

  • QR labels

    Every equipment record has a permanent QR label. Print labels in bulk, and cancel and renew a lost one.

  • Maintenance terminal

    Technicians see the jobs assigned to them in a phone or tablet browser, fill in checklists, and time their work with a timer.

  • Location tree

    Arrange sites, buildings, floors, lines, and rooms in up to 10 levels, and attach equipment to its place in the tree.

  • Meter readings

    Keep up to 20 meters per piece of equipment. When a meter is replaced, accumulated usage is kept.

  • Checklists

    Pass/fail, measurement, number, and text items. An out-of-range reading counts as a finding, and a corrective work order opens from the finding.

  • Equipment import

    Load your equipment inventory from a CSV file; the preview shows which rows will be skipped and why.

  • Work order form

    Print work orders and QR labels, and change their layouts in the document designer.

  • Who sees what

    The maintenance technician role sees only jobs assigned to that person and sees no costs. Cost access is granted separately in the role.

10Compliance

Keep inspection dates and reports at hand

You fill a maintenance plan from the 66-row statutory inspection template that ships with the product, copying the type, interval, and legal basis into the plan. The template is for reference: IWB does not verify the inspector's authorization, and where the relevant standard sets a different interval, that interval applies.

  • Work Equipment Reg. Annex IIITurkish work equipment safety regulation: periodic inspection rows for pressure vessels, lifting and conveying equipment, electrical and fire installations, machine tools, racks, doors, and construction machinery.
  • Additional Art. 2Each row states who carries out the inspection: a person registered in EKIPNET or an inspection body.
  • Elevator Periodic Inspection Reg.Periodic elevator inspection and label follow-up inspections.
  • Elevator Operation and Maintenance Reg.Monthly maintenance and rescue training.
  • If a plan interval exceeds the legal maximum, the form warns but does not block saving.
  • The equipment owner is reminded 60, 30, and 7 days before the inspection date, and weekly once it is overdue.

12

Frequently asked questions

How is Maintenance different from Field Service?

Maintenance covers your company's own machines, buildings, and installations: your employees report faults, and your own technicians or an outside service company do the work. You manage service, warranty, and contract maintenance on your customers' equipment in Field Service. Vehicle maintenance is in Fleet.

Does everyone need an IWB account to report a fault?

Yes, reports come from signed-in users. For employees who run machines, the Self-service role of a restricted user is enough: they see only the Report a fault screen and their own reports. Whoever scans a QR label returns to the report form after signing in.

Do I need to install an app for the maintenance terminal?

No. The terminal opens full screen in a phone or tablet browser, where technicians start, hold, and complete jobs and time their work. The terminal needs a connection, and a warning appears on screen when the connection drops. Periodic inspection results and reports are entered from the office screens.

Can it read sensor data and predict failures?

No. IWB doesn't connect to machines through sensors and doesn't predict failures. You enter meter readings by hand, and a meter-based plan opens the work order when a reading reaches its threshold.

Is there an MTBF, MTTR, or OEE report?

There are no reports by those names. IWB doesn't track machine run time, so mean time between failures and availability aren't calculated. The Faults and Downtime by Equipment report gives the number of faults, total downtime, and the average of closed downtime.