See which materials to buy or make and by which day, along with open orders whose dates no longer fit the need. Requirements planning (MRP) shows where every suggestion comes from, and the ones you approve become requisitions, production orders, or transfers.
Has a fixed per-batch component (planning can't scale it)2
Items left out of planning14
Stock waiting in a quarantine/blocked lot2
Suggestion types
To purchase19
To produce8
To transfer3
Not plannable3
View all39
Suggestion views
To purchase19
To produce8
To transfer3
Not plannable3
To expedite1
To defer1
To cancel0
Date in the past4
Converted0
Overdue3
ListSplitAI chat
Filters1Order datebefore10/20/2026ClearHideRun
Code
Item
Suggestion
Order date
ITEM-000452
Aluminum coil 0.5 mm
Purchase requisition
Oct 13 · Overdue
ITEM-000502
Steel sheet 3 mm St37
Date in the past
Oct 16
ITEM-000101
Aluminum profile 6063
Date in the past
Oct 16
ITEM-000214
Composite panel 4 mm
Date in the past
Oct 17
ITEM-000453
PE core 3 mm
Purchase requisition
Oct 17 · Overdue
ITEM-000611
Screw M6
Purchase requisition
Oct 17 · Overdue
ITEM-000360
Hinge assembly
Date in the past
Oct 19
ITEM-000452
Aluminum coil 0.5 mm
Purchase requisition
Oct 21
ITEM-000453
PE core 3 mm
Purchase requisition
Oct 21
ITEM-000418
Silicone sealant 310 ml
Warehouse transfer
Oct 22
ITEM-000612
Stainless bolt M8
Warehouse transfer
Oct 23
ITEM-000705
Work gloves
Warehouse transfer
Oct 24
ITEM-000143
Powder coating RAL 7016
Expedite
Nov 06 → Oct 27
ITEM-000530
Custom gasket set
Not plannable
Oct 30
Per page2539 records7 records1
ITEM-000452
Purchase requisition
Aluminum coil 0.5 mm·This item's period breakdown and where its requirement comes from.
Where does this requirement come from?
Date
Source
Document / parent item
Quantity
Oct 15
Production order (component)
MO-2026-00119
900
Oct 20
Safety stock / reorder point
-
500
Oct 24
Production order (component)
MO-2026-00113
1,800
Oct 28
Production order (component)
MO-2026-00126
1,980
Planner
Records
MRP
Demand sources
Orders, projects, opportunities, MPS
Planning methods
MRP, min/max, not planned
Data quality checks
17
Connected modules
7
01
Know the latest day to place each order
The suggestion list shows, for every item, the latest day to place the order or start production. IWB works it out from the need-by date by subtracting the purchase or manufacturing lead time and the safety days. Suggestions past that day are flagged as overdue, and purchase suggestions show which rule picked the vendor.
Have IWB pick the vendor by default vendor, lowest current price, or performance score
Minimum order quantities and order multiples are applied to the suggested quantity
A purchase suggestion with no vendor set up shows in red
Choose a horizon from 30 days to 1 year, in days, weeks, or months
/planlama/malzeme-ihtiyacexample data
Material requirements
All suggestions39
To purchase19
To produce8
To transfer3
Not plannable3
Overdue3
MRP-2026-00022 · Oct 20 · 39 suggestionsNet by warehouse
Code
Item
Suggestion
Quantity
Order date
Need-by date
Vendor selection
ITEM-000452
Aluminum coil 0.5 mm
Purchase requisition
2,600 m²
Oct 13 · Overdue
Oct 20 (7 days)
default vendor
ITEM-000453
PE core 3 mm
Purchase requisition
500 m²
Oct 17 · Overdue
Oct 24 (7 days)
only vendor
ITEM-000611
Screw M6
Purchase requisition
8,000 pcs
Oct 17 · Overdue
Oct 31 (14 days)
default vendor
ITEM-000452
Aluminum coil 0.5 mm
Purchase requisition
2,000 m²
Oct 21
Oct 28 (7 days)
default vendor
ITEM-000453
PE core 3 mm
Purchase requisition
1,000 m²
Oct 21
Oct 28 (7 days)
only vendor
ITEM-000318
Edge banding 22 mm
Purchase requisition
1,200 m
Nov 10
Nov 10 (0 days)
No vendor
Order date: need-by date − lead time − safety days.
02
See the reason behind every suggestion
Open a suggestion to see the item's period breakdown: opening stock, gross requirement, scheduled receipts, net requirement, and the suggested quantity. Below it, IWB shows which sales order, production order, project, or safety stock the requirement comes from and which open document covers it. Stock in quarantined or blocked lots doesn't count, and the deducted quantity is shown.
Safety stock is a floor, not demand: IWB plans so stock doesn't drop below it
Requirements covered by a draft document are listed apart from those covered by an approved one
Periods with no activity collapse into one row that you can expand
The full report also covers items that have no suggestion
/planlama/malzeme-ihtiyacexample data
Material requirements
ITEM-000452 · Aluminum coil 0.5 mm
Period
Opening
Gross requirement
Scheduled receipts
Net requirement
Suggestion
Order date
Closing
Oct 20 – Oct 25
640
−2,700
-
2,560
2,600
Oct 13
540
Oct 26 – Nov 01
540
−1,980
-
1,940
2,000
Oct 21
560
1,960 m² quarantined/blocked deducted in the first period. If the stock is released, the suggestion shrinks or goes away.
03
Fix order dates that no longer fit the need
Before it suggests anything new, IWB matches your open orders and production orders to demand, date by date. It suggests expediting an order that will arrive too late, deferring one that will arrive well before it's needed, and canceling one that covers no demand. With your approval, the new date is written to the document, and the change shows on its timeline.
Expedites are suggested even when they're short, but deferrals of up to 7 days aren't
If the shift exceeds 30 days, IWB suggests canceling and opening a new order instead
Documents that are past their date and still open are listed separately
In manufacturing, only draft, unscheduled orders are moved
Approved orders don't change without a trace
Changing the date on an approved document is a separate permission from turning suggestions into documents, and it also needs edit rights on the document itself. If the document changed after the suggestion was made, IWB won't apply the outdated suggestion.
/planlama/malzeme-ihtiyacexample data
Material requirements
All suggestions39
To expedite1
To defer1
To cancel0
Date in the past4
Suggestion type is any of Expedite +2
Code
Item
Suggestion
Quantity
Order date
Document
Reason
ITEM-000502
Steel sheet 3 mm St37
Date in the past
open balance 200 kg
Oct 16
PO-2026-00100
Delivery date 10/16/2026 is in the past and the document is still open.
ITEM-000101
Aluminum profile 6063
Date in the past
open balance 580 kg
Oct 16
MO-2026-00124
Delivery date 10/16/2026 is in the past and the document is still open.
ITEM-000214
Composite panel 4 mm
Date in the past
open balance 100 pcs
Oct 17
MO-2026-00119
Delivery date 10/17/2026 is in the past and the document is still open.
ITEM-000360
Hinge assembly
Date in the past
open balance 1,400 pcs
Oct 19
MO-2026-00122
Delivery date 10/19/2026 is in the past and the document is still open.
ITEM-000143
Powder coating RAL 7016
Expedite
open balance 60 kg
Nov 06 → Oct 27
PO-2026-00105
Demand arises on 10/27/2026; the document date is 11/06/2026.
ITEM-000377
Facade anchor set
Defer
open balance 1,500 pcs
Nov 01 → Nov 20
MO-2026-00125
Demand arises on 11/20/2026; the document date is 11/01/2026.
04
Don't buy again what's sitting in another warehouse
When you plan by warehouse, IWB calculates each warehouse's needs separately. It covers a shortfall first from the replenishment warehouse set on the warehouse record and suggests a warehouse transfer. If none is set, IWB suggests transferring as much as another warehouse has available, and the rest becomes a purchase or production suggestion.
Goods in transit and draft transfers count as supply
Stock in quarantined or blocked lots or at a subcontractor's warehouse isn't used as a transfer source
Transfer suggestions are grouped into one draft transfer order per source and destination pair
Purchase suggestions are grouped into one draft requisition per warehouse
/planlama/malzeme-ihtiyacexample data
Material requirements
All suggestions39
To purchase19
To produce8
To transfer3
Not plannable3
MRP-2026-00022 · Oct 20 · 39 suggestionsNet by warehouse
Code
Item
Warehouse
Quantity
Order date
Need-by date
Document
ITEM-000418
Silicone sealant 310 ml
Main warehouse → Izmir job site warehouse
240 pcs
Oct 22
Oct 24 (2 days)
-TRF-2026-00058
ITEM-000612
Stainless bolt M8
Main warehouse → Izmir job site warehouse
1,000 pcs
Oct 23
Oct 25 (2 days)
-
ITEM-000705
Work gloves
Main warehouse → Izmir job site warehouse
100 pairs
Oct 24
Oct 26 (2 days)
-
The suggestion you convert becomes a draft warehouse transfer order, and its number appears in the Document column.
05
Don't let incomplete item records quietly break the plan
IWB lists items with a missing lead time, BOM, or supply source in order of severity. Planning blockers, assumption-based items, and notes sit in separate groups, and each check tells you what to fix. You fix missing lead times, safety stock, and order multiples on the items you select, all at once.
An item that can't be made or bought shows up as "Not plannable" in the suggestion list instead of being skipped
17 checks across planning, purchasing, manufacturing, and CRM data
Bulk editing is a separate permission, and fields your role can't edit don't appear
Checks with findings are also listed on your planning dashboard
/planlama/veri-kalitesiexample data
Data quality
Can neither be manufactured nor purchased3
No lead time7
No default vendor5
Has a fixed per-batch component (planning can't scale it)2
Items left out of planning14
Stock waiting in a quarantine/blocked lot2
Code
Item
Method
Supply
Purchase lead time (days)
Safety stock
Order multiple
ITEM-000318
Edge banding 22 mm
MRP
Purchased
-
-
-
ITEM-000457
Adhesive film
Min/max
Purchased
-
-
-
ITEM-000462
Protective film 100 mic
MRP
Purchased
-
200
100
ITEM-000614
Steel pin Ø6
MRP
Purchased
-
1,000
500
ITEM-000615
Rivet 4.8 mm
Min/max
Purchased
-
-
1,000
ITEM-000705
Work gloves
Min/max
Purchased
-
-
-
Fix: Enter a lead time on the product record, or fill in the lead time on the vendor record.
06
See materials early for work you're about to win
Demand doesn't only come from sales orders and production orders. Materials planned in a project budget count as demand, minus what's already been issued to the project. If you turn on the setting, quote lines on open CRM opportunities are added, weighted by probability: 250 panels on a 60% opportunity count as 150.
The forecast is off by default, and opportunities below the probability threshold (50% by default) are left out
Accepted or expired quotes aren't included in the forecast
The share that comes from the forecast is shown separately in the period breakdown
If you turn on the master production schedule, your period commitments count as demand too
Where does this requirement come from?Composite panel 4 mm
Aug 01Project budgetPRJ-2026-00021 · Service building exterior facade renovation180
Oct 30Sales orderSO-2026-00188340
Nov 04Sales orderSO-2026-00183120
Nov 13CRM opportunity (probability-weighted forecast)QT-2026-00237 (60%)150
How is it covered?Composite panel 4 mm
Oct 17Production order (finished good)MO-2026-00119100
Oct 26Production order (finished good)MO-2026-00113200
Oct 30Production order (finished good)MO-2026-00126220
Stop keeping a spreadsheet between sales and purchasing
The components of the production order behind a confirmed sales order become demand, and MRP lists the missing materials as purchase suggestions. A suggestion you approve becomes a draft purchase requisition, and once the requisition is approved, it turns into a vendor order.
Ask about the latest run's suggestions, items that can't be planned, or the week a material's balance goes negative. IWB AI only reads in this module, and turning a suggestion into a document stays with you.
IWB AI doesn't run requirements planning, turn suggestions into documents, or change the date on an open document.
New chatWhich materials are we late to order?
Answers your questions
IWB AI
ContactProductInvoiceStatsReport
Which materials are we late to order?
IWB AI
Loading MRP suggestions
Three materials are late to order: Aluminum coil 0.5 mm, PE core 3 mm, and Screw M6. Four open documents are also past their dates.
When will Aluminum coil 0.5 mm run out?
IWB AI
Calculating stock projection
It runs out this week: the Oct 20 – Oct 25 period closes at −2,060 m². Only 640 of the 2,600 m² on hand is available.
ITEM-000452Aluminum coil 0.5 mm
Which open orders should be expedited?
IWB AI
Loading MRP suggestions
1 order should be expedited: PO-2026-00105, Powder coating RAL 7016 (60 kg open). It's dated 11/6/2026 but needed 10/27/2026.
CreateFindAnalyzeSummary
Ask, create, search · @ to mentionWhich materials are we late to order?When will Aluminum coil 0.5 mm run out?Which open orders should be expedited?
IWB AI
In this module, IWB AI only looks things up: it doesn't create or change records.
09Capabilities
What you can do with Requirements Planning
Full report
See the period breakdown of every item with activity, sorted by BOM level, even when it has no suggestion.
Stock projection
See an item's balance period by period on its product record, and the first period it goes negative or drops below safety stock.
Master production schedule
Turn it on in settings to record production commitments by product and period. You choose whether a commitment absorbs sales orders or adds to them.
Delivery promise
When you ask for a promised delivery date on a sales order line, IWB checks available stock, available-to-promise (ATP), and capable-to-promise (CTP), in that order.
Min/max planning
Plan consumables without dates: when stock falls below the reorder point, IWB tops it up to the maximum level.
Separate permissions
Viewing the plan, running it, turning suggestions into documents, and changing dates on approved documents are separate permissions.
Runs per company
Each run is made for your primary company and only counts that company's orders and stock.
IWB AI
Ask about late orders, documents to expedite, or when a material will run out. IWB AI only reads in this module.
No. IWB prepares suggestions, and you open the documents. The suggestions you select become draft purchase requisitions, draft production orders, or draft warehouse transfer orders. Submitting requisitions for approval and ordering from vendors stays with your purchasing team.
What happens if I convert the same suggestion twice by mistake?
No second document is opened. A converted suggestion is marked, and if you try again, IWB tells you it was already applied. If some suggestions can't be converted, IWB reports how many documents were opened and which items failed and why.
When does requirements planning run?
When you run it. Each run is saved under its own number as a snapshot, so you can open an older run and see that day's suggestions. Your planning dashboard shows how many days ago the last run took place.
Does it take capacity into account?
No. Requirements planning calculates material needs and doesn't look at work center load. You track capacity load and scheduling in Manufacturing.
Are sales opportunities included in demand?
Yes, if you turn on the setting. Valid quote lines on open opportunities are weighted by probability, and the default threshold is a 50% probability. The forecast is off by default, and its share is shown separately in the period breakdown.
Does stock waiting for quality approval count?
No. Stock in quarantined or blocked lots can't leave the warehouse, so planning doesn't count it, which may be why a suggestion appeared. The deducted quantity shows in the suggestion's breakdown. Once the stock is released, the suggestion shrinks or goes away in the next run.